Water-powered operation
The gate’s flood-blocking movement requires no electrical drive, according to WSGL’s product information.
CYPRESS × WSGL
Prepare your entrance. Before the water arrives.
We now work with WSGL on flood barrier projects. Speak to one team to coordinate the entrance survey, product selection, supply, installation and maintenance arrangements ahead of the rainy season.
Send a project enquiry
01 / THE SYSTEM
Junli product information is provided by our partner WSGL. We review the entrance and proposed scope with the partner to identify an appropriate solution.
The gate’s flood-blocking movement requires no electrical drive, according to WSGL’s product information.
The barrier responds to incoming water. Keep the movement area clear and follow the operating instructions.
Arrange checks, cleaning and servicing for the chosen model and site conditions.
The gate rests at the entrance. The selected installation must suit everyday pedestrian and vehicle access.
The partner’s hydrodynamic design uses buoyancy to lift the gate as flood water arrives.
The raised panel forms the barrier. Protection height and site interfaces are confirmed during design.
WSGL also lists hand-cranked swing gates and smart flood systems. Monitoring and PA options can be discussed; availability, interfaces and power requirements are confirmed for the selected proposal.
02 / YOUR SITE
These are potential applications, subject to a site assessment. Photos and video on this page are partner references, not Cypress project records.
03 / FROM SURVEY TO SERVICE
Send the address and entrance photos, with flood history and your target programme.
Survey the opening, floor, drainage and everyday access requirements.
Agree the model, responsibilities, quotation and access plan with the partner.
Install and test the agreed scope, hand over operating information and arrange maintenance.
Email or call with the address, premises type and entrance you need to protect. Photos, dimensions and flood history are useful, but you can get in touch before everything is ready.
WSGL describes the Junli hydrodynamic gate as using buoyancy to raise the barrier without an electrical drive. Any additional monitoring, warning or PA equipment needs its own confirmed power and interface requirements.
We can arrange an assessment. Floor conditions, side interfaces, drainage, vehicle loading and access need review before the model and associated work can be confirmed.
Pricing depends on dimensions, model, access and associated works. The proposal sets out supply timing, installation, testing and maintenance terms.
CYPRESS × WSGL
Source: WSGL (HK) Limited. Product information reviewed on 21 September 2026. Confirm the current technical data, model and warranty with the project proposal.
Send the address and a few entrance photos, or call to discuss your site. We will help establish the next step.