DRAWINGS AND BUILDING-SERVICES COORDINATION
Fire and E&M design support and technical coordination
Chung Kwun, Cypress and Ming Wah coordinate with consultants and project teams on site conditions, equipment requirements and working drawings within their respective scope. Statutory design and sign-off remain with the appropriately appointed professionals.
CHUNG KWUN F. S. ENG. CO. LIMITEDMing Wah Development (Engineering) LimitedCYPRESS ENGINEERING COMPANY LIMITED
Call or email with the premises address and a brief description of the work you need.

Illustrative engineering scene
When to get in touch
- A fit-out needs coordinated fire, electrical and air-conditioning work
- Site conditions differ from existing drawings
- Contractors need working information and equipment coordination
- Testing and as-built records need coordination before handover
How we can help
- Review of site conditions, equipment lists and connection points
- Working-drawing and installation-detail support
- Technical coordination with contractors, suppliers and management
- Test planning, as-built information and handover records
Before work starts
- The statutory duties of an AP, RSE, RPE or RFE are outside this service
- Statutory design, certification, signature and submission require the qualified appointed person
- Submit work requiring authority approval through the relevant application process
How we follow up
- 01Confirm the premises, systems and timing
- 02Survey the site and define the scope
- 03Set out the price, access arrangements and what we need from you
- 04Carry out the approved works, test the system and hand over the records
Common questions
Do you provide AP or RSE sign-off?
This service is design support and technical coordination. Statutory professional sign-off must be provided by an appropriately qualified and appointed person.
Discuss the work your premises need
Share the premises, proposed scope and timing. For tender enquiries, include the brief and submission deadline. Available drawings and recent reports help us review the work; you can contact us before everything is ready.
Project and tender enquiriesAbout the companies handling this work
Related fire-safety guides
Taking a lease, fitting out a business or responding to an improvement direction? Check the actual use and documents first, then identify the work arising from Cap. 502, licence conditions and routine maintenance.
Battery-room fire requirements: lithium-ion capacity and design preparationPlanning a battery room, adding modules or changing battery type? Give the design team the data sheets, total capacity and room layout. This guide explains what to prepare and why capacity, room separation and project dates matter.
Hong Kong data-centre fire requirements: design and project coordinationPlanning or altering a data centre means reviewing racks, batteries, room zones and connected systems together. This guide helps project and operations teams prepare design information, outage arrangements and testing responsibilities.
Automated parking fire requirements: 2026 changes and design preparationPlanning automated or mechanised parking? Review Circular 5/2026 applicability, system type, rescue access and fire interfaces with the equipment supplier and design team.
Enquiries and quotations
Call or email with the premises address and a brief description of the work you need.
Prefer an online form?