FROM SITE TO HANDOVER
Fire system installation and alterations
For new installations, fit-outs and changes of use, we define design and approval responsibilities before installation, testing and documentation.
When this service may fit
- Tenant fit-out requiring fire-service alterations
- Changed layouts or use affecting coverage
- Replacement of ageing equipment or system upgrades
- Specified fire works for licensing or authority directions
What we can handle
- Equipment and interface survey
- Drawing, material and method coordination
- Installation, pipe alteration, wiring and integration
- Functional tests, defect correction and handover records
Not included or needs another professional
- Statutory design, structural or building approvals require the appropriate professional
- Work follows approved drawings, quotation and change authority
- Final approval or licensing remains with the relevant authority
How the work proceeds
- 01Confirm the premises, systems and timing
- 02Survey the site and define the scope
- 03Issue a clear quotation with dependencies
- 04Complete the approved works, testing and handover records
Common questions
Can installation begin before drawings are final?
Not where approvals or system interfaces are involved; confirm responsibilities, drawings and scope first to avoid rework.
Related fire-safety guides
Hong Kong fire service installations: maintenance and inspection
A plain-language guide to efficient working order, inspection at least every 12 months and registered contractors under Cap. 95B.
Hong Kong commercial premises fire safetyDistinguish statutory improvement directions, licence requirements, approved plans and routine maintenance duties.
Arrange a fire-system installation survey
Send the premises, equipment or direction details so we can define responsibilities and quotation scope.