Hong Kong data-centre fire requirements: design and project coordination

Planning or altering a data centre means reviewing racks, batteries, room zones and connected systems together. This guide helps project and operations teams prepare design information, outage arrangements and testing responsibilities.

Last reviewed:21 September 20263 min readPublished by Chung Kwun Cypress Fire Engineering Group

Quick answers

Does gas suppression remove all sprinkler requirements?

Check the use of each zone, the applicable code and the accepted design. Ask the design team to show where sprinklers are required and the protection specified for areas where water is undesirable.

Legal information

Requirements vary by premises. Confirm the work with the responsible professional using the premises use, approved plans, licence conditions and any written directions.

Confirm the fire requirements that apply to the project

Circular 2/2025 adds data centres to the FSI Code from 1 August 2025 for specified new-building and major-alteration plan submissions. Whether planning a small server room or a whole data centre, ask the design team to confirm the classification from the use and scope of work.

The amendment covers several fire systems and arrangements for areas where water is undesirable. Ask the design team to show the required equipment for each zone on the plans and explain the choice of protection and connections between systems.

Confirm equipment locations and system connections

For an initial review, prepare rack, battery-room, plant-room, raised-floor and ceiling layouts with expansion plans. Identify unresolved density or configuration assumptions so the team knows what still needs confirmation.

Fire signals may involve ventilation, power, access control and monitoring equipment. Agree with each supplier who will connect and test them. The operations team should explain early which services must stay available so work and outages can be scheduled.

Arrange tests and work in an operating facility

Include fire-equipment tests, documents and authority procedures in the project schedule alongside the planned opening date. If the facility has backup systems or will open in phases, ask the team to identify the fire-protection work needed at each stage.

When comparing quotes, check whether night work, phased tests, specialist equipment and documents are included. For an operating facility, agree outage times with the operations team and who will confirm that equipment has returned to normal afterwards.

Practical checklist

  • Use, plans and applicable project dates
  • Room zones and equipment layouts
  • Battery capacity and expansion plans
  • System interfaces and test responsibilities
  • Work times and documents to be provided

Enquire about data-centre fire installations

Share the use, layout, main equipment and programme so we can define the installation scope and coordination with the design team.

  • Review fire systems and equipment interfaces
  • Coordinate works, outages and testing
  • Quote works, as-built drawings and records

Official sources

The official documents below provide the full requirements and any updates.

Related reading

Engineering & design3 min read

Battery-room fire requirements: lithium-ion capacity and design preparation

Planning a battery room, adding modules or changing battery type? Give the design team the data sheets, total capacity and room layout. This guide explains what to prepare and why capacity, room separation and project dates matter.

Read article
Engineering & design3 min read

New-building fire acceptance: FS172, testing and document preparation

Before a new building is handed over, its fire installations need the applicable acceptance process. Find out how FSD coordinates acceptance, what FS172 records and which plans, tests and repair records the project team should prepare.

Read article
Inspection & maintenance3 min read

Fire-system shutdowns in Hong Kong: reporting, notices and reinstatement

Before a fire system is shut down for repairs, management and the contractor should confirm which equipment will be affected, the notices needed and tests to restore service. This guide explains what to follow up before, during and after the work.

Read article

RELATED SERVICE

Discuss the technical coordination scope

Explore the service, or email or call us to ask about your premises.

View the related service
Chung Kwun Cypress Fire Engineering Group

Discuss the work your premises need

Share the premises, proposed scope and timing. For tender enquiries, include the brief and submission deadline. Available drawings and recent reports help us review the work; you can contact us before everything is ready.

Project and tender enquiries

CONTACT

Need fire, maintenance or commercial engineering support?

Just email or call to ask. Tell us what you need and we will help with the next step. You can contact us before gathering any documents.

Email us

Copy this address and send your enquiry using your email service.

Open email app