Battery-room fire requirements: lithium-ion capacity and design preparation

Planning a battery room, adding modules or changing battery type? Give the design team the data sheets, total capacity and room layout. This guide explains what to prepare and why capacity, room separation and project dates matter.

Last reviewed:21 September 20263 min readPublished by Chung Kwun Cypress Fire Engineering Group

Quick answers

Does gas suppression always remove the need for water-based protection?

It depends on battery chemistry, capacity, fire compartments and the project’s applicable dates. Where the circular requires water-based protection for lithium-ion batteries, have the design team check whether the existing arrangement meets it.

Legal information

Requirements vary by premises. Confirm the work with the responsible professional using the premises use, approved plans, licence conditions and any written directions.

Establish applicability and battery capacity

Circular 3/2025 applies from 1 August 2025 to specified new building-plan submissions, including new buildings and defined major reconstruction or alteration cases. For changes to an existing battery room, review the original approvals and proposed work to establish the applicable requirements.

The amendment requires water-based automatic fixed protection in fire compartments containing more than 20 kWh of lithium-ion batteries, with cases above 600 kWh requiring individual consideration by FSD. Check the complete amendment for applicability.

Get capacity details and room drawings from the supplier

Ask the supplier for battery chemistry, capacity per module, total capacity and expansion plans, alongside room and fire-compartment drawings. For an uninterruptible power supply (UPS), include the actual battery count and capacity so the design team can assess the installation.

Ask the design team how fire protection, ventilation, extraction, power and monitoring will work together, and allow space for maintenance. The quote should list the equipment and connection work so the owner can understand the cost of the complete proposal.

Review capacity increases and battery replacements

Adding battery modules or changing chemistry can alter the basis of the original design. Update the capacity schedule and layout before procurement and ask the professional team to assess the proposed change.

Separate design coordination, installation, testing and documentation in the quotation, with a list of client information needed. Retain the final capacity and configuration records for maintenance and future expansion.

Practical checklist

  • Battery chemistry and capacity by compartment
  • Plan-submission details and project category
  • Room, compartment and equipment layout
  • Services interfaces and expansion plans
  • Tests and final drawings to be provided

Enquire about battery-room fire protection

Share battery data sheets, capacity and room plans so we can review the installation needs and design coordination.

  • Review fire equipment and services interfaces
  • Coordinate designers and equipment suppliers
  • Quote works and tests for the confirmed design

Official sources

The official documents below provide the full requirements and any updates.

Related reading

Engineering & design3 min read

Hong Kong data-centre fire requirements: design and project coordination

Planning or altering a data centre means reviewing racks, batteries, room zones and connected systems together. This guide helps project and operations teams prepare design information, outage arrangements and testing responsibilities.

Read article
Engineering & design3 min read

Sprinkler exemption applications: voids, canopies and supporting information

Planning work around a ceiling, raised floor or canopy? Check whether the space qualifies for a sprinkler exemption, what drawings and material details the application needs, and how approval affects the work schedule.

Read article
Engineering & design3 min read

New-building fire acceptance: FS172, testing and document preparation

Before a new building is handed over, its fire installations need the applicable acceptance process. Find out how FSD coordinates acceptance, what FS172 records and which plans, tests and repair records the project team should prepare.

Read article

RELATED SERVICE

Discuss the technical coordination scope

Explore the service, or email or call us to ask about your premises.

View the related service
Chung Kwun Cypress Fire Engineering Group

Discuss the work your premises need

Share the premises, proposed scope and timing. For tender enquiries, include the brief and submission deadline. Available drawings and recent reports help us review the work; you can contact us before everything is ready.

Project and tender enquiries

CONTACT

Need fire, maintenance or commercial engineering support?

Just email or call to ask. Tell us what you need and we will help with the next step. You can contact us before gathering any documents.

Email us

Copy this address and send your enquiry using your email service.

Open email app