Sprinkler exemption applications: voids, canopies and supporting information
A void or canopy is not automatically exempt from sprinklers. Prepare dimensions, materials, use and drawings, and distinguish an application from permission to alter an installation.
If there is fire or immediate danger
Leave the premises using a safe route and call Hong Kong emergency services on 999. Do not remain to investigate or use a lift.
Legal information
This guide helps with initial planning; it is not legal advice or an engineering assessment of your premises. Confirm the requirements against the use, approved plans, licence conditions, written directions and current official documents.
Quick answers
Is a small ceiling void automatically exempt?
Size alone does not decide it. Check the code, construction, materials, use and formal outcome rather than reusing an exemption from another project.
An application form does not establish an exemption
FSD provides sprinkler-exemption application material for locations including raised floors, ceilings and other voids. The project team should check the applicable code, location and construction before selecting an application route.
Submission, requests for information and written acceptance are separate stages. A pending application is not a basis to remove sprinkler heads or close access; plan the works against the formally confirmed scope.
Describe what is actually inside the space
Prepare plans, sections, dimensions and photographs showing materials, pipes, cables and equipment. A finished-ceiling visual alone does not give the team enough information to understand a concealed space.
If drawings differ from the site, record the discrepancies before deciding on further information or a revised proposal. Define responsibility for investigation, opening-up, drawings and installation work in the quotation.
Review later changes against the accepted conditions
Keep the accepted scope and conditions with the as-built records. If cables, materials or storage use change later, compare the proposal with that record and ask the project team whether further authority confirmation is required.
If sprinkler additions or alterations are needed, allow for shutdown coordination, installation and testing. Include the possible works in the project budget so the fit-out is not planned solely on an assumed exemption.
Practical checklist
- Identify the location and use
- Prepare dimensions, sections and photos
- List materials, cables and equipment
- Keep written acceptance and conditions
- Allow for sprinkler alterations and tests
Discuss sprinkler provision and alterations
Share void or canopy photos, dimensions and plans, plus any exemption application or authority response.
- Review sprinklers and proposed alterations
- Coordinate information with project professionals
- Install and test within the confirmed scope
Official sources
The official documents below provide the full requirements and any updates.
Related reading
New-building fire acceptance: FS172, testing and document preparation
New-building acceptance differs from annual inspection. Understand OFFA coordination, FS172 versus FS251, and how to prepare plans, tests and defect evidence for the project.
Read articleFire-system shutdowns in Hong Kong: reporting, notices and reinstatement
A fire-system shutdown needs a plan for affected systems, connected functions, notices and reinstatement. Prepare these with management and the contractor before work starts.
Read articleRestaurant ventilation fire requirements: controls, tests and records
Restaurant extraction involves more than airflow. Plan ventilation controls, fire-system interfaces and licensing documents together before closing ceilings or arranging tests.
Read articleRELATED SERVICE
Arrange a sprinkler-system survey
Explore the service, or email or call us to ask about your premises.
Discuss the work your premises need
Share the premises, proposed scope and timing. For tender enquiries, include the brief and submission deadline. Available drawings and recent reports help us review the work; you can contact us before everything is ready.
Project and tender enquiries