Engineering & design
Sprinkler exemption applications: voids, canopies and supporting information
Planning work around a ceiling, raised floor or canopy? Check whether the space qualifies for a sprinkler exemption, what drawings and material details the application needs, and how approval affects the work schedule.
Quick answers
Is a small ceiling void automatically exempt?
The code also considers construction, materials and use, with formal confirmation where required. Send dimensions, sections and photos of the void to the project team for an initial assessment.
Legal information
Requirements vary by premises. Confirm the work with the responsible professional using the premises use, approved plans, licence conditions and any written directions.
Check which spaces may qualify
FSD provides sprinkler-exemption application material for locations including raised floors, ceilings and other voids. The project team should check the applicable code, location and construction before selecting an application route.
After submission, the project team may need to provide further information and wait for written acceptance and any conditions. Keep existing sprinkler heads and inspection access in place while the application is being considered, then arrange alterations within the confirmed scope.
Describe what is actually inside the space
Prepare plans, sections, dimensions and photos showing the materials, pipes, cables and equipment inside the space. For enclosed areas, ask the professional team how they can be inspected so the application describes the actual construction.
If the drawings differ from the site, mark the differences and ask the project team what information is needed. In the quotation, identify who will survey the space, arrange inspection openings, prepare drawings and carry out the work.
Review later changes against the accepted conditions
Keep the accepted scope and conditions with the as-built records. If cables, materials or storage use change later, compare the proposal with that record and ask the project team whether further authority confirmation is required.
The application outcome will determine whether sprinklers need to be added or altered, so allow for that possibility in the budget. If work is needed, agree shutdown timing, the work sequence and final tests with management and the contractor.
Practical checklist
- Identify the location and use
- Prepare dimensions, sections and photos
- List materials, cables and equipment
- Keep written acceptance and conditions
- Allow for sprinkler alterations and tests
Discuss sprinkler provision and alterations
Share void or canopy photos, dimensions and plans, plus any exemption application or authority response.
- Review sprinklers and proposed alterations
- Coordinate information with project professionals
- Install and test within the confirmed scope
Official sources
The official documents below provide the full requirements and any updates.
Related reading
New-building fire acceptance: FS172, testing and document preparation
Before a new building is handed over, its fire installations need the applicable acceptance process. Find out how FSD coordinates acceptance, what FS172 records and which plans, tests and repair records the project team should prepare.
Read articleFire-system shutdowns in Hong Kong: reporting, notices and reinstatement
Before a fire system is shut down for repairs, management and the contractor should confirm which equipment will be affected, the notices needed and tests to restore service. This guide explains what to follow up before, during and after the work.
Read articleRestaurant ventilation fire requirements: controls, tests and records
Ventilation equipment must respond to fire signals as its design requires. This guide explains how the fire and ventilation contractors coordinate that response, and what to prepare before closing ceilings, testing and handover.
Read articleRELATED SERVICE
Arrange a sprinkler-system survey
Explore the service, or email or call us to ask about your premises.
Discuss the work your premises need
Share the premises, proposed scope and timing. For tender enquiries, include the brief and submission deadline. Available drawings and recent reports help us review the work; you can contact us before everything is ready.
Project and tender enquiries

