Restaurant ventilation fire requirements: controls, tests and records
Ventilation equipment must respond to fire signals as its design requires. This guide explains how the fire and ventilation contractors coordinate that response, and what to prepare before closing ceilings, testing and handover.
Quick answers
Which documents should I collect for the ventilation system?
Use the issued fire and ventilation requirements to collect the relevant certificates, test reports, equipment information and maintenance contacts from each contractor. Check which equipment and work each document covers.
Legal information
Requirements vary by premises. Confirm the work with the responsible professional using the premises use, approved plans, licence conditions and any written directions.
Identify extraction, ventilation and fire controls
Kitchen extraction, general ventilation and fire-related ventilation controls have different functions. FSD publishes requirements for licensed premises; the team should identify which apply to the actual system and issued conditions.
List fans, ducts, controls and fire-system connections together, marking which belong to the tenant and which are shared building equipment. Ask management and the contractors to agree access, connections and responsibilities before installation.
Arrange joint testing of connected systems
The fire-control test checks how ventilation equipment responds to an alarm or other relevant signal. Appropriate contractors should test against the accepted design and record each response, including anything that needs correction or another test.
Before testing, agree the time, affected areas and reinstatement plan with management and both contractors. Explain any tenant coordination in advance and record who will verify that normal operation has resumed.
Check access before closing ceilings and collect records
Before ceilings are closed, photograph key equipment, access panels and labels, and update the drawings. This gives future maintenance teams a usable record and helps avoid unnecessary opening-up work.
At handover, collect the fire and ventilation certificates, reports and maintenance information applicable to the project. If older records differ from the completed layout, resolve those differences and agree the updates needed.
Practical checklist
- Current duct and fire-equipment drawings
- Fan, control and equipment details
- Tenant and common-system boundaries
- Shutdown, interface-test and reinstatement windows
- Documents and maintenance contacts for each trade
Discuss restaurant fire and ventilation coordination
Share existing or proposed extraction drawings, issued requirements and the works programme so we can discuss coordination and testing.
- Review fire signals and equipment interfaces
- Coordinate testing with the ventilation contractor
- Follow up alterations, records and documents
Official sources
The official documents below provide the full requirements and any updates.
Related reading
Restaurant fire safety in Hong Kong: planning, fit-out and licensing
What fire work does a restaurant need? Prepare the premises details, cooking plan, issued requirements and inspection records before arranging a survey and quotation.
Read articleRestaurant fuel fire safety: LPG, town gas, electricity and charcoal
Before choosing restaurant fuel, check the kitchen location, storage and ventilation. Understand basement restrictions and why dining-area cooking needs a separate review.
Read articleFire-system shutdowns in Hong Kong: reporting, notices and reinstatement
Before a fire system is shut down for repairs, management and the contractor should confirm which equipment will be affected, the notices needed and tests to restore service. This guide explains what to follow up before, during and after the work.
Read articleRELATED SERVICE
Arrange a restaurant fire-services survey and quote
Explore the service, or email or call us to ask about your premises.
Discuss the work your premises need
Share the premises, proposed scope and timing. For tender enquiries, include the brief and submission deadline. Available drawings and recent reports help us review the work; you can contact us before everything is ready.
Project and tender enquiries