WATER, PUMPS, VALVES AND PIPEWORK
Fire sprinkler system works
From supplies and pumps to valve sets, pipework and heads, work is planned around system zones and premises use.
When this service may fit
- Leaking pipework, valves or sprinkler heads
- Fit-out partitions or ceilings affecting head positions
- Abnormal pump, pressure or flow indications
- Defects found in testing or equipment replacement
What we can handle
- Supply, pump and valve-set inspection
- Pipe alteration and sprinkler-head positioning
- Pressure, flow and alarm-interface testing
- Defect repair, reinstatement and records
Not included or needs another professional
- Shutdown, draining and isolation require coordination with management and affected parties
- Structural openings or major building work require separate professional assessment
- Design and hydraulic requirements follow approved information
How the work proceeds
- 01Confirm the premises, systems and timing
- 02Survey the site and define the scope
- 03Issue a clear quotation with dependencies
- 04Complete the approved works, testing and handover records
Common questions
Does every fit-out need sprinkler alterations?
It depends on partitions, ceilings, use and existing coverage; the site and drawings must be reviewed.
Related fire-safety guides
Hong Kong fire service installations: maintenance and inspection
A plain-language guide to efficient working order, inspection at least every 12 months and registered contractors under Cap. 95B.
A monthly building fire-safety checklistA non-invasive visual inspection framework for owners' corporations, property management and responsible persons.
Arrange a sprinkler-system survey
Send the premises, equipment or direction details so we can define responsibilities and quotation scope.


