Fire installation alterations: drawings, FS251 and FSI/314 documents
Moving sprinklers, hose reels or other fixed equipment during a fit-out calls for a review of drawings and scope. Understand what the documents do before coordinating the work.
Quick answers
Should documents be checked for moving only a few sprinkler heads?
Yes. Moving heads changes their layout. Share the proposed positions with the contractor so they can confirm the drawings, tests and documents needed before work starts.
Legal information
Requirements vary by premises. Confirm the work with the responsible professional using the premises use, approved plans, licence conditions and any written directions.
Identify what is changing
Replacing a faulty part and changing an installation layout may require different work and documentation. Mark proposed changes on the existing plan and identify changes to partitions, ceilings, use or fixed equipment positions.
Involve the fire contractor while the fit-out is being designed. Check sprinkler coverage, hose-reel positions and connections to other equipment before work starts, as these can affect ceilings, partitions and the construction schedule.
Confirm the certificates, drawings and forms needed
FSD's FAQs explain that layout or fixed-equipment changes may require drawings and FSI/314 documents alongside FS251. Ask the contractor to list the documents needed for your work and when each will be submitted.
The form depends on the work and premises. FSD lists FSI/314 and 314A alongside forms for commercial, composite or domestic, and industrial buildings. Have the responsible contractor confirm the current documents and submission sequence.
Keep drawings up to date through to handover
Share existing and proposed drawings, management requirements and relevant notices. The quote should identify responsibility for drawings, site work, testing and document follow-up.
If positions change during construction, ask the relevant teams to review the change. At handover, collect drawings reflecting the installation, test records and applicable certificates, with a list of outstanding documents.
Practical checklist
- Existing and proposed drawings
- Premises use and management requirements
- Responsibilities for drawings, work and documents
- Access, shutdown and handover dates
- Agree current drawings and document handover
Discuss fire installation alterations
Send the existing and proposed plans to Chung Kwun or Cypress so we can review the scope, quotation and coordination needed.
- Review site and drawing scope
- Arrange alteration work and testing
- Follow up applicable documents
Official sources
The official documents below provide the full requirements and any updates.
Related reading
Hong Kong FS251 certificate: annual inspection & forms
FS251 is Hong Kong’s fire installation certificate. Check the 12-month inspection rule, due dates, official forms, equipment codes and online submission.
Read articleSprinkler exemption applications: voids, canopies and supporting information
Planning work around a ceiling, raised floor or canopy? Check whether the space qualifies for a sprinkler exemption, what drawings and material details the application needs, and how approval affects the work schedule.
Read articlePreparing fire safety improvement works for inspection and handover
After improvement work is completed, arrange testing, document submission and the authority's inspection. Find out what records to prepare, who needs to attend and what to collect at handover.
Read articleRELATED SERVICE
Arrange a fire-system installation survey
Explore the service, or email or call us to ask about your premises.
Discuss the work your premises need
Share the premises, proposed scope and timing. For tender enquiries, include the brief and submission deadline. Available drawings and recent reports help us review the work; you can contact us before everything is ready.
Project and tender enquiries