Planning A&A works in Hong Kong: drawings, roles and procedures

Before alterations and additions, establish the existing condition, proposed change and applicable procedure. Prepare approved plans, professional appointments, management requirements and quotation information, including a review of whether any designated minor-works route applies.

Last reviewed: 3 min readPublished by Chung Kwun Cypress Fire Engineering Group
Alterations and additions work coordination

Establish records before choosing the solution

Describe the proposed location, dimensions and use, attaching photographs and available approved plans. Refer discrepancies, missing records or questions about existing unauthorised work to the responsible professional. An existing physical condition should not automatically be used as evidence of an approved design.

For structural changes, floor openings, external walls, escape provisions or common parts, review feasibility and professional responsibilities first. BD's A&A guidance also highlights deed and lease conditions. Rights of use or management agreement do not by themselves settle the building-work procedure.

Confirm the procedure and appointments

BD advises consulting building professionals about A&A works and the applicable approval and consent process. Designated minor works may follow the MWCS simplified requirements where eligible. The project needs a review of the actual work item and conditions; price or duration alone does not determine the route.

Set out responsibilities for design, calculations, submissions, supervision, construction and completion records. Confirm which authorised persons, registered engineers and contractors the particular work requires. Keep the professional assessment and agreed procedure in the project record before dependent work starts.

Confirm the procedure and appointments
Planning stageConfirmation for the owner
Existing recordsApproved plans, site discrepancies and unresolved matters.
Proposal and procedureExtent of change, applicable procedure and professional appointments.
Quotation and worksInclusions for submissions, supervision, protection, works and making good.
Management and useDeed restrictions, access, occupier effects and work windows.
Completion recordsRequired records, submissions, updated plans and follow-up responses.

Use review points before starting and changing work

Before starting, confirm procedure status, construction revision and site protection. Show unresolved professional processes as programme dependencies. A management access approval should be recorded as that milestone, with other approvals or notifications checked on their own requirements.

If strip-out reveals unexpected structure, services or conditions, retain the findings for review by the responsible professionals. At completion, collect applicable records and updated plans, tracking outstanding works and authority responses separately so later maintenance or alterations can refer to the actual project history.

Prepare these details for your enquiry

  • Proposed locations, dimensions and use
  • Approved plans and site discrepancies
  • Applicable procedure and professional appointments
  • Management, deed and occupier arrangements
  • Pre-start checks, changes and completion records

Common questions

Are all small projects exempt from approval?

Review the actual work and applicable regime. Designated minor works still have the relevant professional, contractor and procedural requirements; area or price alone does not settle the classification.

Can a tenant remove walls before a professional review?

Obtain the appropriate professional assessment first, checking the wall, escape provisions and required procedure before defining the work that can proceed.

Discuss A&A works and a site review

Send existing/proposed drawings and available professional advice to review works and coordination.

  • Review the work scope
  • Identify professional and site coordination
  • Define quotation and handover items
Discuss A&A works and a site review

Official sources

Project checklists are preparation advice. Refer to the original documents and the responsible professionals for requirements applicable to your premises.

Chung Kwun Cypress Fire Engineering Group

Discuss the work your premises need

Share the premises, proposed scope and timing. For tender enquiries, include the brief and submission deadline. Available drawings and recent reports help us review the work; you can contact us before everything is ready.

Project and tender enquiries

About the companies handling this work

Related safety references

Email us

Copy this address and send your enquiry using your email service.

Open email app