Fire engineering quotations: drawings, equipment and scope checklist

Prepare a fire-engineering quotation brief that identifies the problem, premises and deliverables. Use the scope worksheet below to give contractors comparable information and make differences between their proposals easier to resolve.

Last reviewed: 3 min readPublished by Chung Kwun Cypress Fire Engineering Group
Hong Kong fire services and installation works

Start with the reason for the work

Identify whether the request concerns installation, alterations, repair, annual inspection or ongoing maintenance. Record the trigger, such as a changed fit-out plan, an equipment fault or a written requirement. A project may need several of these services; list them separately so the quotation covers each requested task.

Give the full address, floor and unit, identifying tenant areas and shared installations. Date and label the drawing revision. Where drawings are unavailable, supply photographs and known equipment details, marking quantities that require a survey as unconfirmed rather than treating them as a fixed inventory.

Use a common scope worksheet

Issue the same information to each bidder and ask for assumptions, inclusions and separately priced items. If the survey reveals additional work, circulate the clarification to every invited contractor so revised quotations remain comparable.

Check contractor registration against the actual installations and tasks. Establish which legal entity contracts for the work, which party controls the design and who performs the relevant inspections. These roles should be identifiable in the proposal before appointment.

Use a common scope worksheet
Quotation itemInformation to provide
Equipment and quantitiesInventory, locations, known makes/models and items awaiting verification.
Drawings and requirementsCurrent drawing revision, written requirements and the extent of this change.
Site coordinationAccess windows, shutdown arrangements, drainage and attendance by other trades.
Tests and recordsTest scope, witnesses, as-built information, reports and applicable certificates.
Unconfirmed itemsSeparate rates, quantity verification and the person approving variations.

Resolve differences before appointment

Before comparing totals, allocate removal, making good, power supplies, testing, retesting and documents. For work affecting existing installations, ask the contractor and management to address connected-system effects and the required notices. Confirm the affected scope rather than assuming neighbouring systems remain operational.

Nominate an owner or management representative to receive clarifications, authorise additional work and accept records. At completion, reconcile equipment, test results, outstanding items and documents against the agreed worksheet, assigning an owner and follow-up date to each remaining action.

Prepare these details for your enquiry

  • Reason for work and full premises address
  • Dated drawing revisions or site photographs
  • Equipment, quantities and unverified information
  • Installation, shutdown, testing and trade responsibilities
  • Exclusions, variation authority and handover list

Common questions

Can I enquire with photographs only?

Yes. Provide the address, reason for work and photographs taken safely. Photos cannot establish concealed pipes, wiring or a complete inventory; the proposal should identify what still needs verification on site.

Does the lowest quotation include all approvals?

The total price does not establish that. Allocate design, statutory submissions, management permission and authority inspections explicitly, recording any parts excluded from the contractor's scope.

Discuss your fire-engineering scope and quotation

Send the address, project trigger and available drawings so we can identify the survey and quotation scope.

  • Check equipment and contracting company
  • Identify installation and coordination items
  • Set out testing and handover records
Discuss your fire-engineering scope and quotation

Official sources

Project checklists are preparation advice. Refer to the original documents and the responsible professionals for requirements applicable to your premises.

Chung Kwun Cypress Fire Engineering Group

Discuss the work your premises need

Share the premises, proposed scope and timing. For tender enquiries, include the brief and submission deadline. Available drawings and recent reports help us review the work; you can contact us before everything is ready.

Project and tender enquiries

About the companies handling this work

Related safety references

Email us

Copy this address and send your enquiry using your email service.

Open email app