Planning by premises
Restaurant refurbishment: kitchen, ventilation, fire works and licence records
A restaurant refurbishment needs more than a finishes schedule. Bring licence status, kitchen equipment, fuel, ventilation and fire drawings into one brief, then agree interfaces and document responsibility with the relevant professionals and contractors.
Restaurant fire services and licensing coordinationSet out the licence position and proposed change
Supply current licence information, approved or submitted plans, written requirements and earlier alterations. Identify whether the work is refurbishment, kitchen renewal, seating changes or a change in use or operation. Check the applicable applications and professional work against the actual proposal with the relevant authority and appointed parties.
List each kitchen item's function, dimensions, fuel and connection information rather than its brand alone. Give the design team exhaust, make-up air, plumbing and maintenance-access needs. Keep dependent routes and capacity checks open until equipment selections are sufficiently defined.
Close the gaps between work packages
Issue the same drawing and equipment schedules to fit-out, kitchen, ventilation, fire and other trades. For each interface, name who supplies, connects and tests it. Compare exclusions across quotations so a necessary task does not remain unallocated between packages.
Where walls, external openings or common parts are affected, obtain review by the appropriate professionals and management. Track landlord or management agreement separately from building and licensing processes, with a named contact responsible for each outstanding decision.
| Interface | Include in the brief |
|---|---|
| Kitchen equipment | Dimensions, fuel, connections and supplier scope. |
| Ventilation and ducts | Routes, wall penetrations, cleaning access and management conditions. |
| Fire installations | Existing/proposed layout, equipment interfaces and test coordination. |
| Building work and finishes | Openings, protection, making good and pre-closure checks. |
| Licensing and records | Drawing revisions, submitter, written requirements and pending responses. |
Check works completion and opening arrangements separately
Programme closure or phased-work windows, deliveries and joint tests. Where an existing restaurant remains in operation, the operator and professional team should establish the permissible work and safety arrangements for each phase. Confirm those dependencies before relying on a contractor's installation programme.
At handover, reconcile equipment, operating information, tests and applicable records, retaining outstanding items. Authority inspections, licensing and operational preparations have their own conditions. Track their status and next actions separately from physical refurbishment completion. Identify who books each inspection and who keeps the original records for later alterations.
Prepare these details for your enquiry
- Licence, plans and written requirements
- Kitchen equipment and fuel information
- Ventilation, fire and building interface register
- Closure/phasing and joint tests
- Handover documents and opening actions
Common questions
Should a kitchen equipment replacement include fuel and ventilation information?
Give the responsible parties the new equipment details to review connections and potential effects, then confirm the applicable work and procedures.
Can the fit-out programme establish an opening date?
Review professional processes, authority requirements, supply and operational readiness separately, confirming each stage. Completion of fit-out work does not establish that every opening condition has been met.
Discuss restaurant fire works and refurbishment coordination
Send licence information, kitchen schedules and proposed plans to review fire work and trade interfaces.
- Review installation work
- Coordinate kitchen and ventilation interfaces
- Define tests and records
Official sources
Project checklists are preparation advice. Refer to the original documents and the responsible professionals for requirements applicable to your premises.


