Restaurants & licensing
Restaurant fire safety in Hong Kong: planning, fit-out and licensing
What fire work does a restaurant need? Prepare the premises details, cooking plan, issued requirements and inspection records before arranging a survey and quotation.
Quick answers
What should I check when taking over a restaurant?
Have the existing equipment inspected, then check it against your licence category, layout, fuel and issued requirements. The contractor can identify what to retain, alter or test again.
Legal information
Requirements vary by premises. Confirm the work with the responsible professional using the premises use, approved plans, licence conditions and any written directions.
Start with the premises and cooking arrangements
Fire requirements vary with the licence category, building, floor and cooking arrangements. FSD publishes reference requirements for different food premises; the requirements issued for your actual premises remain the starting point.
Before committing to the fit-out, gather the layout, kitchen location, seating and fuel plan. Ask the landlord or management about shared fire systems, then have the contractor confirm the equipment and connections needed inside the shop.
Coordinate fire work with ventilation and fit-out
Ceilings, partitions and extract ducts can affect fire-equipment positions. Use one current drawing set across trades, and include management-office access, shutdown arrangements and testing windows in the programme.
Ask for separate prices for new equipment, alterations, testing, documents and repairs. When taking over a restaurant, have the contractor inspect existing equipment and identify what can stay, what needs replacing and what must move to suit the new layout.
Prepare for inspection and ongoing maintenance
After installation, check the equipment against the drawings and test records. FS251 records specified fire-installation work. The licence application also needs the applicable ventilation and supporting documents for the licensing authority's approval.
At handover, request routine-check instructions, maintenance contacts and a list of open items. If seating, fuel or kitchen arrangements change later, review the implications before proceeding with the alteration.
Practical checklist
- Address, floor and licence category
- Layout, kitchen and seating plan
- Fuel and cooking-equipment details
- Issued fire requirements and management conditions
- Target opening date and available work windows
Arrange a restaurant fire-services survey and quote
You can enquire before all documents are ready. Share the address, restaurant type and target opening date so we can explain the next step.
- Surveys for new and former restaurant premises
- Fit-out coordination, alterations and functional tests
- Defined works, documentation and maintenance arrangements
Official sources
The official documents below provide the full requirements and any updates.
Related reading
Restaurant fuel fire safety: LPG, town gas, electricity and charcoal
Before choosing restaurant fuel, check the kitchen location, storage and ventilation. Understand basement restrictions and why dining-area cooking needs a separate review.
Read articleRestaurant ventilation fire requirements: controls, tests and records
Ventilation equipment must respond to fire signals as its design requires. This guide explains how the fire and ventilation contractors coordinate that response, and what to prepare before closing ceilings, testing and handover.
Read articleHong Kong RFE scheme: choosing a route for restaurant licensing
Applying for a food-business licence? A Registered Fire Engineer (RFE) and a fire-installation contractor have different roles. Understand the assessment option and who will handle drawings, works and certification before appointing your team.
Read articleRestaurant outdoor seating: hose reels, extinguishers and fire access
Planning outdoor restaurant seating? Review the approved area, hose-reel coverage, extinguishers and access. For hotpot or food warming, also check the permitted fuel and operating conditions.
Read articleTeppanyaki fire requirements: fuel, gas shut-off and project planning
Opening a teppanyaki restaurant or adding a counter? Review fuel restrictions, secure installation and gas or electrical documentation before coordinating the fire works.
Read articleRELATED SERVICE
Arrange a restaurant fire-services survey and quote
Explore the service, or email or call us to ask about your premises.
Discuss the work your premises need
Share the premises, proposed scope and timing. For tender enquiries, include the brief and submission deadline. Available drawings and recent reports help us review the work; you can contact us before everything is ready.
Project and tender enquiries

