Building fire safety
IoT fire detection for older Hong Kong buildings: scope and planning
Circular 3/2026 provides an alternative for specified buildings of six storeys or fewer under Cap. 572. Review eligibility, system responsibilities and ongoing costs before comparing proposals.
If there is fire or immediate danger
Leave the premises using a safe route and call Hong Kong emergency services on 999. Do not remain to investigate or use a lift.
Legal information
This guide helps with initial planning; it is not legal advice or an engineering assessment of your premises. Confirm the requirements against the use, approved plans, licence conditions, written directions and current official documents.
Quick answers
Does IoT detection remove the other direction requirements?
No. The circular concerns the specified hose-reel and manual-alarm alternative. Other applicable requirements still need to be addressed.
Check the building's eligibility first
Circular 3/2026 addresses target composite and domestic buildings of six storeys or fewer under Cap. 572. It accepts IoT detection with portable extinguishers as an alternative to specified hose-reel and manual-alarm requirements.
Other applicable fire requirements remain. Owners should first provide the direction, floor count and use details to the relevant professionals or FSD, then compare proposals on the basis of confirmed applicability.
Assign installation, communications and monitoring roles
The circular's arrangement includes FSI and non-FSI components, signal transmission and monitoring services. A consumer smart smoke alarm is not, by itself, the complete alternative solution described by FSD.
Ask the proposal to name the parties responsible for devices, connectivity, the platform and maintenance. Clarify fault contacts, access to individual units and handover arrangements if the service provider changes.
Compare ongoing costs and access requirements
Compare installation charges separately from connectivity, platform, maintenance and replacement costs, and check the contract term. Device prices alone do not describe the building's ongoing management commitment.
Owners or the owners' corporation can gather access contacts and available times, then discuss phased arrangements with the team. Keep survey, test and open-item records for handover and future inspections.
Practical checklist
- Confirm the Cap. 572 direction and building details
- Check storeys, use and applicability
- Assign FSI, communications and platform roles
- Compare installation and ongoing charges
- Plan unit access and record handover
Discuss an older-building fire-improvement plan
Share the building's storeys, use and Fire Safety Direction so we can review installation improvements and specialist coordination.
- Review written requirements and existing installations
- Clarify the proposal and service responsibilities
- Arrange a case-specific survey and works quotation
Official sources
The official documents below provide the full requirements and any updates.
Related reading
Received a Fire Safety Direction? Deadlines, responsibilities and quotations
For a direction under Cap. 502, 572 or 636, start with the full document, deadline and responsible parties. Separate fire installations from building works before arranging quotations.
Read articleA plain-language guide to the Fire Safety (Buildings) Ordinance
How Cap. 572 directions, works and completion follow-up apply to certain older composite and domestic buildings.
Read articleFire alarm and detection annual inspections: a preparation checklist
Manual alarms and automatic detection use distinct checklists. Prepare system plans, device lists, access and interface testing, then follow up defects and FS251 records.
Read articleRELATED SERVICE
Send the direction for an initial review
Explore the service, or email or call us to ask about your premises.
Discuss the work your premises need
Share the premises, proposed scope and timing. For tender enquiries, include the brief and submission deadline. Available drawings and recent reports help us review the work; you can contact us before everything is ready.
Project and tender enquiries

