Teppanyaki fire requirements: fuel, gas shut-off and project planning
Opening a teppanyaki restaurant or adding a counter? Review fuel restrictions, secure installation and gas or electrical documentation before coordinating the fire works.
Quick answers
Can bottled LPG supply a teppanyaki counter?
The specific teppanyaki requirements prohibit bottled LPG in the designated area. Have the proposed supply checked against the document during design.
Legal information
Requirements vary by premises. Confirm the work with the responsible professional using the premises use, approved plans, licence conditions and any written directions.
Confirm the fuel before ordering the counter
FSD's teppanyaki requirements exclude liquid fuel and bottled LPG in the designated area. They allow electricity, centralized LPG or town gas, with automatic gas shut-off where piped gas is used.
Ask the equipment supplier for the model, energy requirements and installation drawing with the quotation. Have site conditions checked before fabrication so supply and control issues can be resolved while changes are still practical.
Define installation, supply and testing responsibilities
The cooking unit must be secured. Electrical, town-gas and piped-LPG systems each have installation and documentation requirements. Appoint appropriately qualified people for the fire, gas and electrical work, and agree which documents each will provide.
List who handles gas shut-off controls, fire signals, extraction and related equipment, and allow time for joint testing. Before placing orders, agree who will test each part, resolve problems and provide the required documents.
Review seating and maintenance access together
Teppanyaki customers sit close to cooking equipment. Put the actual appliance dimensions, seating, staff routes and maintenance access on the same drawing so the contractors can check positions and space before work starts.
When taking over a restaurant or adding another counter, review the altered area again. Keep the previous records for comparison and ask the team to identify drawings, tests and certificates that need updating.
Practical checklist
- Cooking-unit model and energy needs
- Fuel supply and automatic shut-off proposal
- Seating, staff routes and service access
- Fire, ventilation, electrical and gas responsibilities
- Joint-testing and document handover dates
Arrange a teppanyaki fire-works assessment
Share the counter location, appliance model and fuel plan so we can review the fire scope and trade coordination.
- Review fire equipment and counter positions
- Coordinate tests with the relevant specialists
- Define alterations, records and quotation scope
Official sources
The official documents below provide the full requirements and any updates.
Related reading
Restaurant fuel fire safety: LPG, town gas, electricity and charcoal
Before choosing restaurant fuel, check the kitchen location, storage and ventilation. Understand basement restrictions and why dining-area cooking needs a separate review.
Read articleRestaurant ventilation fire requirements: controls, tests and records
Ventilation equipment must respond to fire signals as its design requires. This guide explains how the fire and ventilation contractors coordinate that response, and what to prepare before closing ceilings, testing and handover.
Read articleRestaurant fire safety in Hong Kong: planning, fit-out and licensing
What fire work does a restaurant need? Prepare the premises details, cooking plan, issued requirements and inspection records before arranging a survey and quotation.
Read articleRELATED SERVICE
Arrange a restaurant fire-services survey and quote
Explore the service, or email or call us to ask about your premises.
Discuss the work your premises need
Share the premises, proposed scope and timing. For tender enquiries, include the brief and submission deadline. Available drawings and recent reports help us review the work; you can contact us before everything is ready.
Project and tender enquiries